Pre-Existing Defects Pre-date the Chernobyl Nuclear Plant Disaster
More Information

InspectAPedia TM Home & Site Map
Air Conditioning
InspectAPedia Bookstore
Electrical
Environment
Exteriors
Heating
Home Inspection
Insulate Ventilate
Interiors
Mold Inspect/Test
Plumbing Water Septic
Roofing
Structure
More Information
Accuracy & Bias Pledge
InspectAPedia TM Home & Site Map
Contact Us




Construction Flaws from the Chernobyl Nuclear Electrical Power Generating Plant - Background for the Chernobyl Nuclear Disaster and Meltdown
StructAPedia ©

Google
 
Our site offers impartial, unbiased advice without conflicts of interest. We will block advertisements which we discover or readers inform us are associated with bad business practices, false-advertising, or junk science. Our contact info is at inspect-ny.com/appointment.htm.

This document, previously classified as secret, discloses long pre-existing construction flaws in the Chernobyl nuclear plant, possible factors leading to the Chernobyl nuclear meltdown and subsequent disaster. Safe electrical power, nuclear hazards, electrical power generation are discussed. © Copyright 2008 Daniel Friedman, All Rights Reserved. Information Accuracy & Bias Pledge is at below-left. Use links at the left of each page to navigate this document or to view other topics at this website. Green links show where you are in our document or website.

[Memorandum # 40]

Not for publication - Secret

21 Feb. 79 05363 Return to the General Section of the Central Committee of the CPSU

Central Committee of the CPSU

USSR COMMITTEE OF STATE SECURITY [KGB]

February 21, 1979 No. 346-A Moscow

Construction Flaws at the Chernobyl Nuclear Power Plant [AES]

According to data in the possession of the KGB of the USSR, design deviations and violations of construction and assembly technology are occurring at various places in the construction of the second generating unit of the Chernobyl AES, and these could lead to mishaps and accidents.

The structural pillars of the generator room were erected with a deviation of up to 100 mm from the reference axes, and horizontal connections between the pillars are absent in places. Wall panels have been installed with a deviation of up to 150 mm from the axes. The placement of roof plates does not conform to the designer's specifications. Crane tracks and stopways have vertical drops of up to 100 mm and in places a slope of up to 8 degree.

Deputy head of the Construction Directorate, Comrade V. T. Gora, gave instructions for backfilling the foundation in many places where vertical waterproofing was damaged. Similar violations were permitted in other sections with the knowledge of Comrade V. T. Gora and the head of the construction group, Comrade IU. L. Matveev. Damage to the waterproofing can lead to ground water seepage into the station and radioactive contamination of the environment.

The leadership of the Directorate is not devoting proper attention to the foundation, on which the quality of the construction largely depends. The cement plant operates erratically, and its output is of poor quality. Interruptions were permitted during the pouring of especially heavy concrete causing gaps and layering in the foundation. Access roads to the Chernobyl AES are in urgent need of repair.

Construction of the third high-voltage transmission line is behind schedule, which could limit the capacity utilization of the second unit.

As a result of inadequate monitoring of the condition of safety equipment, in the first three quarters of 1978, 170 individuals suffered work-related injuries, with the loss of work time totaling 3,366 worker-days.

The KGB of Ukraine has informed the CPSU Central Committee of these violations. This is for your information.

Chairman of the Committee [KGB] [signed] IU. Andropov

[Memorandum # 42]

Secret

Copy no. 1

USSR MINISTRY OF POWER AND ELECTRIFICATION (MINENERGO USSR)

Central Committee CPSU

Kitaiskii pr. 7

Moscow, K-74 103074

Minenergo USSR

Central Committee of the CPSU Moscow K-11 A.T. 112604

MAR. 16, 79 07738 3-16-79 No. 1381-2c

Return to General Section of the Central Committee

Checking the structural condition of the first unit of the Chernobyl AES.

At the instruction of the USSR Minister of Power and Electrification, a commission under the chairmanship of Deputy Minister Comrade F. V. Sapozhnikov was formed to check the quality of construction and assembly work on the first unit of the Chernobyl AES.

The commission visited the site on March 5-6, 1979, and examined the state of the buildings and structures of the first unit of the Chernobyl AES and the notes on the quality of construction and assembly work.

The Commission found that violations of construction technology and design deviations have been documented.

In each specific instance, engineering solutions were adopted (in the construction, the operation, or by the designers) to eliminate deviations and make the structures conform to the specifications of the original design and normative documents.

Some of the measures have been realized; the rest of the work is being completed according to a rigid timetable set by the commission.

At the present time the power station is operating successfully, and there are no hindrances to its further operation.

Taking into account the specifics of nuclear power stations, and attaching primary significance to the reliability and safety of their operations, the USSR Ministry of Power and Electrification has issued an order to enhance monitoring of technical standards observance and the quality of construction

and assembly work at all AESs under construction. A letter of similar content was sent to the Central Committee of the Communist Party of Ukraine.

Deputy Minister [signed] P. P. Falaleev

Secret

CENTRAL COMMITTEE OF THE CPSU

Defects in the Construction of the Chernobyl AES

More Information on Building Diagnostic Inspections and Repairs

Chairman of the KGB of the USSR, Comrade IU. V. Andropov, reports about the low quality of construction work on various sections of the second unit of the Chernobyl AES of the USSR Ministry of Power and Electrification.

As instructed, Comrade Minister P. S. Neporozhnii has formed a special commission under the leadership of Deputy Minister Comrade Sapozhnikov to examine and carefully analyze the facts cited. The commission visited the site to conduct a thorough investigation of design deviations and to inspect the system of monitoring the quality of construction and assembly work.

It was found that in erecting individual pillars, wall panels, and crane track stopways, there indeed were instances of deviation from the reference axes and substandard construction practices. Most of these deviations were exposed by the design inspectorate of the Gidroproekt Institute and a technical site inspection, and they were documented.

The Chernobyl AES construction directorate along with the design organization and client have adopted coordinated engineering solutions ensuring design reliability and construction quality. Some of the deviations have been eliminated, and the rest of the measures are being carried out. A timetable under the control of the Ministry leadership has been established to eliminate the noted deficiencies.

The specialists conclude that at present there are no obstacles to the subsequent operation of the Chernobyl AES, and the electric power station is operating reliably.

To raise the quality of construction and assembly work and strengthen control over fire and radiation safety, the Ministry has published instructions stipulating strict verification of the quality of work at AES construction sites by Ministry commissions, enhancing quality inspection laws, training engineers and technicians, strengthening fire-fighting procedures, and monitoring observation of safety regulations.

....

The Central Committee of the Communist Party of the Ukraine has been informed of the measures taken by the ministry.

Head of the Section of Machine Building of the Central Committee of the CPSU. [SIGNATURE] (V. Frolov)

March "23", 1979

Nos. 05363,07738, 60A/II.

Use links at the left of each page to navigate this document or to view other topics at this website. Green links show where you are in our document or website.

More expert information on this topic


...
More Information

InspectAPedia TM Home & Site Map
Air Conditioning
InspectAPedia Bookstore
Electrical
Environment
Exteriors
Heating
Home Inspection
Insulate Ventilate
Interiors
Mold Inspect/Test
Plumbing Water Septic
Roofing
Structure
Accuracy & Bias Pledge
Contact Us

More Information on Building Diagnostic Inspections and Repairs

    ...

goto InspectAPedia.com - authoritative, in-depth Building Diagnostic and Repair Information for building buyers, owners, inspectorsInspectAPedia.com - Home Page - Building Inspection, Diagnosis, & Repair, Environmental Inspection & Testing - Research Website

GO TO the MOLD and INDOOR ENVIRONMENT INFORMATION CENTER for in-depth advice on avoiding testing for or cleaning up mold and other indoor environmental hazards, odors, gases, contaminantsThe Mold Information Center: What to Do About Mold in Buildings, When and How to Inspect for Mold, Clean Up Mold, or Avoid Mold Problems

GO TO MOLD TEST KITS: This expert-recommended mold test kit is cheap and yet top performing *IF* you use a competent analysis laboratory!Use this simple, economical mold test kit by following our instructions on how to collect and mail mold samples to our lab

GO TO IAQ/MOLD-TEST LAB SERVICES: Mold, Pollen, indoor air quality, field and laboratory services by an expert.Environmental Inspection, Testing, & Diagnosis On-Site IAQ, Gas, Air Testing, Mold Investigation, Sick Building Diagnosis, Lab Services, & Remediation Plan Preparation - indoor air quality testing, problem source determination, supporting lab work, written remediation plan addressing removal of environmental and other hazards and prevention of their recurrence.

GO TO our PRE PURCHASE BUILDING INSPECTION SERVICES: Authoritative information for home buyers and home owners is included with your inspection.Home Inspection Construction Consulting Services & advice for home buyers

CONTACT Daniel Friedman - Dan is a senior ASHI home inspector, nationally recognized expert on building inspection, building failures, and sick building investigationContact Daniel Friedman for website content suggestions or for fee-paid consulting

Google
 

05/09/2008 - 05/22/1988 - www.inspect-ny.com/structure/ChernobylHistory.htm - © 2008 Copyright Daniel Friedman All Rights Reserved